Land Forces 2026

There has been more news about AUKUS Pillar One and the developing story that Australia will no longer receive two second hand and one new Virginia class submarine from the US – as had been previously promised. The government is all over the shop, claiming that the closure of the Strait of Hormuz somehow justifies the acquisition of SSNs. No it doesn’t – submarines are almost completely useless in the current scenario because you can’t use them for clearing minefields or shooting down swarms of drones.

Under the original deal the new submarine was to be a Block VII Virginia, delivered in 2038. Block VII is much more powerful than the second hand Block IVs. They will carry 40 Tomahawk surface attack cruise missiles, compared with 12 for a Block IV. They will also have features for protecting undersea cables and launching a variety of uncrewed systems. Put simply, a Block VII is a far more powerful, modern, deterrent than Block IV.

Any official who says Block IVs are preferred because they are cheaper to maintain – even though they cannot say how much cheaper – should be sacked. A single Block VII carries as many Tomahawks as three and a half Block IVs. (A Virginia Block VII is 115m in length, not 140m.)

To listen to the podcast, click here.

APDR_Bulletin_728X90


For Editorial Inquiries Contact:
Editor Kym Bergmann at [email protected]

For Advertising Inquiries Contact:
Group Sales Director Simon Hadfield at [email protected]

Previous articleBoeing beefs up Ghost Bat capabilities
Next articleSmart Shooter wins follow-on US Marine Corps contract
Kym Bergmann
Kym Bergmann has more than 35 years of experience in journalism and Australian and international defence industry. After graduating with Honors from the Australian National University, he joined Capital 7 television, holding several positions including foreign news editor and chief political correspondent. After 2 years on the staff of a Federal Minister, he moved to the defence sector and held senior positions in several companies, including Blohm+Voss, Thales, Celsius and Saab. In 1997 he was one of 2 Australians selected for the Thomson CSF 'Preparation for Senior Management' MBA course, the other being Chris Jenkins - formerly the CEO of Thales Australia. He has also worked as a consultant for a number of companies, including Raytheon, Tenix (now part of BAES) and Martin Marrietta (now part of Lockheed Martin). He had several board appointments, including Thomson Sintra Pacific (1994 - 96) and Saab Pacific (1998 - 2003). He retains good personal links with senior figures in Government, as well as in industry and the media. He decided to return to journalism in May 2008, and holds the position of editor for Asia Pacific Defence Reporter (APDR) and Defence Review Asia (DRA). He is also a podcaster and commentator on defence and national security issues.

10 COMMENTS

  1. The yawning void exists in the articulation of Australia’s defence strategy. Pragmatics suggest that denial of sea/air gap remains Australia’s clearest achievable means of defence. Mr Marles’s term of ‘impactful projection’ is an fragile fever dream, and the regression to Virginia Block IV VLS capacity reveals the truth in Keating’s claim that Australian submarines in the South China Sea would be the equivalent of ‘throwing toothpicks at the mountain’.

    Australia could achieve the same naval strike capability of three Virginia Block IVs with a half squadron of F-15 EX, fitted with LRASMs. Total crew at risk – 24. Cost of acquisition – around the price of a single Collins LOTE refit.

    Finally, at the risk of seeming like a broken record, the Arafura is the perfect platform for the development, testing, deployment and sustainment of the Speartooth LUUV across the Arafura and Timor Seas. Give CIVMEC Henderson some work and restore the program with vessels upgraded for close in air and drone self defence, mine clearance and electronic monitoring capabilities.

  2. Block VII is 115m and doesn’t have the VPM(extra 25m hull extension for 4×7 cells-28 extra missiles), only Block V and VI do.
    Block VII may not go ahead with a new SSN planned.

    • No, Block IV is 115m / 8,000 tonnes. Block VII is 140m / +10,000 tonnes. Basically, Block VII incorporates the VPM inside the hull and adds some extra capabilities.

      My real point was not so much differences between Block IV and Block VII – I don’t think we will get either – but rather to point out the sheer stupidity of the government’s position, swallowing hook, line and sinker the complete nonsense they have been told by the RAN, coupled with their own inability to critically think about AUKUS.

LEAVE A REPLY

Please enter your comment!
Please enter your name here